Water Tank
The product is suitable for the storage of building water supply,regulating the expansion of water tanks,heating systems,condensate tanks and temporary storage tanks for building construction,industry,national defense and so on.
Product advantages
1.The installation is simple and convenient,and the process of secondary installation of the original insulated water tank is canceled , which saves the installation period.
2.Beautiful appearance,stable structure and good corrosion resistance.
Water Tank
Introduction
Water tanks are classified into six types based on their materials: fiberglass reinforced plastic (FRP) water tanks, stainless steel water tanks, stainless steel inner tank FRP water tanks, seawater FRP water tanks, enamel water tanks, and galvanized steel plate water tanks. The water tank is generally equipped with HYFI remote transmission liquid level electric valve, water level monitoring system, automatic cleaning system and self-cleaning disinfection device. The overflow pipe of the water tank is connected to the drain pipe valve of the water tank and is equipped with insect-proof net. The water tank should have two ventilation pipes of different heights (equipped with insect-proof net), and the water tank is equipped with internal and external ladders. Water tanks generally have an inlet pipe, an outlet pipe (domestic outlet pipe, fire outlet pipe), an overflow pipe and a drainage pipe. According to their different functions, water tanks are classified into five types: domestic water tanks, fire water tanks, production water tanks, civil air defense water tanks and household water towers.
The galvanized steel water tank is a new type of water tank designed and manufactured by GRAD.The manufacture and installation of this product are not affected by civil construction,no welding equipment,one-time stretch forming,beautiful and durable,prevent secondary pollution of water quality,and conform to the standardization and system of building products.Chemical and factory requirements.
This product adopts Q235 steel panel and is stamped to form standard blocks of 2000×1000,2000×500,1500×1000, 1500×500,1000×1000 and 1000×500,500×500,etc.,assembling on site,assembling Non-toxic rubber mats are placed between the standard blocks and bolted.
The storage volume ranges from 1.0 cubic meters to 3000 cubic meters and the height can reach 5 meters.
The diameter of the inlet pipe,outlet pipe and overflow pipe of the water tank shall be determined by design:there shall be no less than 700mm passages around the water tank,and the bottom of the tank and the top of the tank shall be not less than 600mm.The connection gap between the bottom of the box and the standard block at the bottom of the box shall be located on the support.
Water filing experiment:After the water tank is assembled,close the outlet pipe and the drain pipe,open the inlet pipe,and check it while releasing the water.When it is full,it will keep the water for 2-3 hours.The thickness of the board has the thickness of the national standard and the thickness of the company,which is freely chosen by the customers.
1. Tank foundation 9.Top panel
2.Tank base 10.Inner ladder
3.Drain outlet 11.Outer ladder
4.Side panel 1 12. Manhole
5.Side panel 2 13.Manhole cover
6.Bolted flat mat connection 14.Tie piece
7.Side panel 3 15.Support
8.Air vent 16.(double)water inlet
17.(double)water outlet
About us
Establised in 1993, GRAD Group covers an area of 1.15 million square meters and has more than 2,000 employees, with an annual output value of nearly 4 billion yuan. GRAD Group's main business: central air conditioning chiller and terminal products, FRP water tank, FRP winding pipe, FRP storage tank, wind turbine cabin cover, environmental protection equipment, and other more than 130 varieties. GRAD Group is the pillar enterprise of the “Dezhou Central Air-Conditioning City” named by the China Refrigeration and Air-Conditioning Industry Association. It ranks the top 10 among central air-conditioning enterprises in the country, The top 3 composite material enterprises,and gets the first-class qualification for the installation of national electromechanical equipment and the second-class qualification for air purification engineering. GRAD Group can undertake central air conditioning engineering, purification engineering construction.
Express and payment
1. Delivery Day: 20 days after deposit is confirmed.
2. Delivery Term: FOB,CIF,CFR or EXW are welcomed.
3. Payment Term: T/T,30% deposit,70% before delivery or 100% Irrevocable L/C at sight.
4. Warranty: Warranty for 12 months from the date of shipment from the factory.
5. Payment Currency: USD,EUR or CNY.7. For sample or small quantity one or two, We suggest Express DHL etc.







